Bethel, City of: City Dock East Timber Wall Reconstruction - Design
Award Number:  1414 (1 Project)
Theme:  Transportation
Award Performance Period:  05/01/2012 to 12/31/2014
Award Status:  Award Closed Out
Contact(s):  Adison Smith (Denali Commission)
Bobby Sutton (Bethel, City of)
Monica Armstrong (Denali Commission)
Peter Williams (Bethel, City of)
Tessa Axelson (Denali Commission)
Scope of Work:  This project will design a reconstruction solution for the City of Bethel east timber wall section of the existing city dock structure along the Kuskokwim River. The work will include scoping and preliminary engineering; environmental, permitting, right-of-way clearances and final PS&E/bid documents to replace or otherwise repair the deteriorated east timber wall of Bethel’s city dock face. The existing wall is deteriorated with fractured and/or displaced timber facing boards and potentially displaced or rotated steel pile connectors.
Authorizing Document(s):
 
Award Level Funding
Current Amount %
Obligation $0.00  
Drawdowns $0.00 0%