Aleutians East Borough: Sand Point New Harbor Float - Construction
Award Number:  01295 (1 Project)
Theme:  Transportation
Award Performance Period:  07/01/2010 to 12/31/2012
Award Status:  Award Closed Out
Contact(s):  Adison Smith (Denali Commission)
Anne Bailey (Aleutians East Borough)
Betty Sorensen (Denali Commission)
Mike McKinnon (Denali Commission)
Monica Armstrong (Denali Commission)
Roxanne Newman (Aleutians East Borough)
Sharon Boyette (Aleutians East Borough)
Tessa Axelson (Denali Commission)
Scope of Work:  This construction project is the initial stage of overall inner-harbor facilities. The project includes the fabrication and installation of approximately 3,036 square-feet of heavy duty timber marginal floats (253 feet in length) on 16-inch diameter, and ½-inch wall galvanized steel guide piles with anodes, which will support side-tie moorage bottom fish vessels in the range of 80 to 160-feet in length. Access will be by way of one 50-foot long gangway serving Float B. The float will be installed with portable water, electrical service, and low level lighting and safety equipment.
Authorizing Document(s): Transp Memo
 
Award Level Funding
Current Amount %
Obligation $1,100,000.00  
Drawdowns $1,100,000.00 100%