At-a-Glance for Award #1427
Alaska Village Electric Cooperative: Stebbins - Saint Michael Intertie Construction
Printer-Friendly VersionPrinter-Friendly Version
Award Number:  1427   ( 1 Project )
Theme:  Energy
Award Performance Period:  09/01/2012 to 06/30/2016
Award Status:  Award Closed Out
Contact(s):  Alden Worachek (Alaska Village Electric Cooperative)
Alyona Selhay (Alaska Village Electric Cooperative)
Janet Davis (Denali Commission)
Meera Kohler (Alaska Village Electric Cooperative)
Onya Stein (Alaska Village Electric Cooperative)
Steven Gilbert (Alaska Village Electric Cooperative)
Tom Wolf (Denali Commission)
Scope of Work:  The intertie will consist of approximately 7 miles of new line and upgrades to roughly 3 miles of existing line. The project also includes distribution upgrades at each end of the intertie, necessary to integrate the new intertie with each community's existing electrical grid. A new prime power plant to be located in Stebbins and a standby backup power plant for Saint Michael are in design.
Authorizing Document(s):
 
Award Level Funding
Current Amount %
Obligation $2,565,654.00  
Drawdowns $2,565,654.00 100%