Awards
Search Details Financial Reporting Projects
At-A-Glance | Overview | Attachments | Contacts | Status
SITE MAP | HELP  
At-a-Glance for Award #1418
Nenana, City of: Nenana 9th Avenue Reconstruction Phase II
Printer-Friendly VersionPrinter-Friendly Version
Award Number:  1418   ( 1 Project )
Theme:  Transportation
Award Performance Period:  07/01/2012 to 12/31/2015
Award Status:  Award Closed Out
Contact(s):  Jason Mayrand (Nenana, City of)
Monica Armstrong (Denali Commission)
Nicole Woicikowfski (Denali Commission)
Tessa Axelson (Denali Commission)
Scope of Work:  This project is an extension of the existing 9th Ave. from its current terminus 0.9 miles to the newly constructed K Street. The design for 9th Ave. was complete along with the K Street project under the Bureau of Indian Affairs (BIA). The BIA design will need to be modified and updated for the remaining work on 9th Ave. to be constructed according to FHWA contracting methods. There is currently an unimproved construction service road on the alignment. The project will improve drainage, add road structure to accommodate traffic and provide surfacing material. The improved road will be approximately 24-feet wide within the existing city right of way of 60 feet.
Authorizing Document(s):
 
Award Level Funding
Current Amount %
Obligation $951,730.83  
Drawdowns $951,730.83 100%

Spacer
DENALI COMMISSION
510 'L' Street, Suite 410, Anchorage, Alaska 99501
907-271-1414  Fax 907-271-1415  Toll Free 888-480-4321
Contact System Administrator