Awards
Search Details Financial Reporting Projects
At-A-Glance | Overview | Attachments | Contacts | Status
SITE MAP  
At-a-Glance for Award #01191
Alaska Village Electric Cooperative: New Stuyahok Power Plant Pad Construction
Printer-Friendly VersionPrinter-Friendly Version
Award Number:  01191   ( 1 Project )
Theme:  Energy
Award Performance Period:  09/01/2009 to 09/30/2012
Award Status:  Award Closed Out
Contact(s):  Alden Worachek (Alaska Village Electric Cooperative)
Betty Sorensen (Denali Commission)
Brent Petrie (Alaska Village Electric Cooperative)
Jerri Lyn Tallant (Alaska Village Electric Cooperative)
Jodi Fondy (Denali Commission)
Meera Kohler (Alaska Village Electric Cooperative)
Monica Armstrong (Denali Commission)
Nina Sterbenz (Alaska Village Electric Cooperative)
Onya Stein (Alaska Village Electric Cooperative)
Sean Robbins (Alaska Village Electric Cooperative)
Scope of Work:  This award of $315,000 will provide for the construction of a leveled, compacted and otherwise properly prepared gravel pad, upon which the existing AVEC electric power plant will eventually be relocated. AVEC is providing match funding to this award in the amount of $35,000. This award provides funding only for the gravel pad itself, with no funds to relocate and expand the generation capacity.
Authorizing Document(s): 09 WP  
 
Award Level Funding
Current Amount %
Obligation $283,844.00  
Drawdowns $283,844.00 100%

Spacer
DENALI COMMISSION
510 'L' Street, Suite 410, Anchorage, Alaska 99501
907-271-1414  Fax 907-271-1415  Toll Free 888-480-4321
Contact System Administrator