Awards
Search Details Financial Reporting Projects
At-A-Glance | Overview | Attachments | Contacts | Status
SITE MAP | HELP  
At-a-Glance for Award #01164
Department of Transportation: Takotna Gold Creek Bridge Replacement
Printer-Friendly VersionPrinter-Friendly Version
Award Number:  01164   ( 1 Project )
Theme:  Transportation
Award Performance Period:  08/01/2009 to 12/31/2013
Award Status:  Award Closed Out
Contact(s):  Betty Sorensen (Denali Commission)
Donna Adams (Department of Transportation)
Geri Henricksen (Department of Transportation)
John Linnell (Department of Transportation)
Mike McKinnon (Denali Commission)
Monica Armstrong (Denali Commission)
Nicole Woicikowfski (Denali Commission)
Tessa Axelson (Denali Commission)
Scope of Work:  To complete the design work to replace the existing deteriorating 30’ x 16’ timber bridge (DOT Bridge #0473) with a larger, single span steel bridge, approximately 75’ x 18’. This includes raising the elevation of the bridge by 5’-6’, increase the hydraulic opening beneath the bridge by 500% and support the new bridge on foundations protected from the effects of scour and ice build-up.
Authorizing Document(s):
 
Award Level Funding
Current Amount %
Obligation $272,910.00  
Drawdowns $272,910.00 100%

Spacer
DENALI COMMISSION
510 'L' Street, Suite 410, Anchorage, Alaska 99501
907-271-1414  Fax 907-271-1415  Toll Free 888-480-4321
Contact System Administrator