Awards
Search Details Financial Reporting Projects
At-A-Glance | Overview | Attachments | Contacts | Status
SITE MAP  
At-a-Glance for Award #313-07
Alaska Power Company: Eagle Hydrokinetic Turbine Project
Printer-Friendly VersionPrinter-Friendly Version
Award Number:  313-07   ( 1 Project )
Theme:  Energy
Award Performance Period:  06/01/2007 to 12/31/2010
Award Status:  Award Closed Out
Contact(s):  Betty Sorensen (Denali Commission)
Denali Daniels (Denali Commission)
Jodi Fondy (Denali Commission)
Karl Wood (Alaska Power Company)
Monica Armstrong (Denali Commission)
Robert Grimm (Alaska Power Company)
Scope of Work:  The electrical generation facilities in Eagle are currently listed as #31 on the Commissions statewide energy deficiency list. Alaska Power Company (APC) has completed initial design and permitting for a hydrokinetic Turbine to be installed in the Yukon River near Eagle. The utility in Eagle could save approximately $135,000.00/year if they do not run the diesels about 57% of the operating budget
Authorizing Document(s): 07-EN  
 
Award Level Funding
Current Amount %
Obligation $1,604,745.00  
Drawdowns $1,604,745.00 100%

Spacer
DENALI COMMISSION
510 'L' Street, Suite 410, Anchorage, Alaska 99501
907-271-1414  Fax 907-271-1415  Toll Free 888-480-4321
Contact System Administrator