Awards
Search Details Financial Reporting Projects
At-A-Glance | Overview | Attachments | Contacts | Status
SITE MAP  
At-a-Glance for Award #280-07
Bethel, City of: Bethel Brown's Slough Bank Stabilization
Printer-Friendly VersionPrinter-Friendly Version
Award Number:  280-07   ( 1 Project )
Theme:  Transportation
Award Performance Period:  05/23/2006 to 12/31/2008
Award Status:  Award Closed Out
Contact(s):  Adison Smith (Denali Commission)
Betty Sorensen (Denali Commission)
Laurie Walters (Bethel, City of)
Mike McKinnon (Denali Commission)
Monica Armstrong (Denali Commission)
Wally Baird (Bethel, City of)
Scope of Work:  This project consists of construction of a dock face and associated uplands on the Kuskokwim River to complete the Bethel Waterfront system. The project fills in a gap in the Bethel Waterfront that limits shipping operations and creates an area where river currents are able to erode both the unimproved are and the downriver sheet pile wall in the waterfront system.
Authorizing Document(s): 06-18  
 
Award Level Funding
Current Amount %
Obligation $570,000.00  
Drawdowns $570,000.00 100%

Spacer
DENALI COMMISSION
510 'L' Street, Suite 410, Anchorage, Alaska 99501
907-271-1414  Fax 907-271-1415  Toll Free 888-480-4321
Contact System Administrator