At-a-Glance for Award #0122-DC-2004-I10
Chugach Electric Association, Inc.: Fire Island Transmission Line and Wind Power Feasibility Studies
Printer-Friendly VersionPrinter-Friendly Version
Award Number:  0122-DC-2004-I10   ( 1 Project )
Theme:  Energy
Award Performance Period:  01/01/2004 to 12/31/2007
Award Status:  Award Closed Out
Contact(s):  Kathy Harris (Chugach Electric Association, Inc.)
Kathy Prentki (Denali Commission)
Peter Poray (Chugach Electric Association, Inc.)
Steve Gilbert (Chugach Electric Association, Inc.)
Scope of Work:  The proposed project studies the feasibility of the construction of a submarine and overhead electrical transmission intertie between Anchorage and Fire Island, a substation, a barge landing and roads to wind turbine sites. An intertie project would make private investment in wind turbines feasible and the south end of the island could support up to 100 MW of wind turbines.
Authorizing Document(s): 05-18  04-01  
 
Award Level Funding
Current Amount %
Obligation $1,160,979.93  
Drawdowns $1,160,979.93 100%